Success Stories

Lourdes Hospital | Binghampton, NY

A FEMA-sponsored flood mitigation that included 11 FloodBreak floodgates enabled Lourdes to remain fully operational in the September 2011 flood. Read the FEMA Best Practice Story

IBWC Rio Grande Flood Control Project | TX & NM

FloodBreak is providing multiple roadway floodgates as part of the Levee Rehabilitation in the Upper & Lower Rio Grande, helping raise the levees and bring them into compliance with FEMA accreditationLearn more

Bayshore Medical Center | Pasadena, TX

Following severe flooding, a FloodBreak passive flood barrier system was installed in 2007 and allowed Bayshore to remain fully operational during Tropical Storm Erin and Hurricane Ike flooding.

Union-Endicott High School | Binghampton, NY

The school was completely shut down by flooding in 2007 but a self-funded installation of FloodBreak passive floodgates helped keep the school dry in the September 2011 floods.

Route 22 Honda | Hillside, NJ

After shutting down for flood-related repairs in 2007, Route 22 installed a FloodBreak passive flood barrier system and was saved from 2009 flooding. Flash flooding occurred again in 2013 bu the underground garage was again protected.

Kensington Gate | Great Neck, NY

The underground garage had flooded numerous times resulting in damaged vehicles and lost parking revenue. Since the installation of a FloodBreak Automatic Floodgate, parked vehicles have been saved twice. Read the Success Story

See more of our work on our projects page