A passive FloodBreak® flood barrier was selected as the closure device in the flood control berm to protect the plant while still accommodating vehicular traffic on the two-lane road adjacent to the facility. The floodgate was designed to support HS-25 vehicular loads and flood loads to the 6.5″ flood elevation. In 2015, a 38’ x 6.5’ FloodBreak® floodgate with a hydraulic lift was installed at the new pump station. The FloodBreak flood barrier system ensures 24/7 protection without human intervention while allowing a local two-lane road to remain functional. The hydraulic lift allows a single operator to lift the barrier instantly for standard operating procedures and/or scheduled maintenance.